空壓機的(de)停用(yòng)在各個單位都常有發(fā)生。那麼(me)在初次開機前空(kōng)壓機停放時間超過三個月或空壓機停用時間超過(guò)三個月,再次開機前需(xū)要采取有效措施,bi須先請專業(yè)空壓機人員對機器(qì)進行保養檢測(cè),制定安全措施,避(bì)免開(kāi)機後發生不(bú)良狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電路狀态,是否正常(cháng)供電,電壓是否穩定;測量電動機絕(jué)緣電阻,數值大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢(jiǎn)查空壓機配件上(shàng)是否含有積水,灰塵,及(jí)時清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口,出(chū)氣口全面(miàn)檢(jiǎn)測,防止發生堵塞現象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述都已經完成的情況可以接通電源,查看電腦控制器是否正常運行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和潤滑油(yóu)。因為在長期不用的(de)情況下,三(sān)濾,油可能發生老化現象,從而造成空壓(yā)機開機運行時間不長即結膠積碳(tàn)或堵塞,油路不暢使空壓機主機或其他零部(bù)件損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試機,電路改造後人工(gōng)控制加載卸載,先空(kōng)載(zǎi)運行10分鐘以上,檢測各項指标和(hé)震動、噪音等正常(cháng),再進行(háng)加載,查看各部件運行正(zhèng)常即(jí)可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電路狀态,是否正常(cháng)供電,電壓是否穩定;測量電動機絕(jué)緣電阻,數值大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢(jiǎn)查空壓機配件上(shàng)是否含有積水,灰塵,及(jí)時清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口,出(chū)氣口全面(miàn)檢(jiǎn)測,防止發生堵塞現象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述都已經完成的情況可以接通電源,查看電腦控制器是否正常運行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和潤滑油(yóu)。因為在長期不用的(de)情況下,三(sān)濾,油可能發生老化現象,從而造成空壓(yā)機開機運行時間不長即結膠積碳(tàn)或堵塞,油路不暢使空壓機主機或其他零部(bù)件損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試機,電路改造後人工(gōng)控制加載卸載,先空(kōng)載(zǎi)運行10分鐘以上,檢測各項指标和(hé)震動、噪音等正常(cháng),再進行(háng)加載,查看各部件運行正(zhèng)常即(jí)可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.